Rigging, Lifting and Banksman Awareness
2 days SC programme focused on Rigging, Lifting and Banksman Awareness, using energy-sector cases and applied decisions.
Download complete course manual (PDF)
YOUR AVATAR GUIDE
Learn with your course presenter
Listen to any module using the voice available on this device. Choose a module below to begin.
What you will learn
- Explain core principles and terminology for Rigging, Lifting and Banksman Awareness.
- Interpret an applied case using evidence and stated assumptions.
- Identify risks, safeguards, role boundaries and escalation points.
- Prepare a clear recommendation for a multidisciplinary audience.
Module 1: Rigging, Lifting and Banksman Awareness: Core Concepts
Learning objectives
- Explain rigging, lifting and banksman awareness: core concepts, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Rigging, Lifting and Banksman Awareness: Core Concepts
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Rigging, Lifting and Banksman Awareness
Teaching notes
Core explanation. Rigging, Lifting and Banksman Awareness: Core Concepts describes a practical part of Rigging, Lifting and Banksman Awareness. Learners connect the principles to asset performance, people, operational risk, project value and local context.
Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for rigging, lifting and banksman awareness: core concepts. Decisions require current information, role-appropriate authority, competent review and documented assumptions.
Worked example. Use an applied Namibia-relevant case in which a team plans rigging, lifting and banksman awareness: core concepts while balancing safety, integrity, schedule, cost, environmental protection and local capability.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a decision brief for rigging, lifting and banksman awareness: core concepts: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a decision brief for rigging, lifting and banksman awareness: core concepts: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 2: Rigging, Lifting and Banksman Awareness: Risk Controls
Learning objectives
- Explain rigging, lifting and banksman awareness: risk controls, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Rigging, Lifting and Banksman Awareness: Risk Controls
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Rigging, Lifting and Banksman Awareness
Teaching notes
Core explanation. Rigging, Lifting and Banksman Awareness: Risk Controls describes a practical part of Rigging, Lifting and Banksman Awareness. Learners connect the principles to asset performance, people, operational risk, project value and local context.
Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for rigging, lifting and banksman awareness: risk controls. Decisions require current information, role-appropriate authority, competent review and documented assumptions.
Worked example. Use an applied Namibia-relevant case in which a team plans rigging, lifting and banksman awareness: risk controls while balancing safety, integrity, schedule, cost, environmental protection and local capability.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a decision brief for rigging, lifting and banksman awareness: risk controls: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a decision brief for rigging, lifting and banksman awareness: risk controls: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 3: Permit to work isolation and SIMOPS
Learning objectives
- Explain permit to work isolation and simops, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Permit to work isolation and SIMOPS
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Rigging, Lifting and Banksman Awareness
Teaching notes
Core explanation. A permit coordinates specified work within defined conditions and time. It complements risk assessment, isolation, competence and supervision. SIMOPS review considers interactions between tasks that may be safe individually but unsafe together.
Decision logic. Walk through planning, authorisation, briefing, verification, suspension and handback conceptually. A signature does not establish a safe condition. Changes in scope, personnel or environment require review under the site system. Never reuse a classroom permit as operational authorisation.
Worked example. Hot work and a nearby hydrocarbon transfer are proposed concurrently. Their interaction needs coordinated review.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Review two fictional permits and identify interface conflicts and suspension triggers.
Model answer guide. Include shared hazards, isolation boundaries, authority, communication and revalidation after change.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Review two fictional permits and identify interface conflicts and suspension triggers.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 4: Human factors and safe teamwork
Learning objectives
- Explain human factors and safe teamwork, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Human factors and safe teamwork
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Rigging, Lifting and Banksman Awareness
Teaching notes
Core explanation. Human performance is influenced by fatigue, workload, design, communication and organisational pressure. Errors are not explained adequately by blaming an individual. Teach clear handover, challenge, confirmation and usable procedures.
Decision logic. Identify conditions that make error likely and improve the system. A worker should be able to raise concerns without retaliation. Discuss language and comprehension checks, especially where teams have different experience levels. Avoid presenting awareness as immunity from error.
Worked example. A night-shift handover omits an isolation limitation because both workers assume the other knows.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Redesign the handover and role-play a closed-loop confirmation.
Model answer guide. Include critical status, restrictions, pending actions and acknowledgement, supported by a usable record.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Redesign the handover and role-play a closed-loop confirmation.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 5: Rigging, Lifting and Banksman Awareness: Work Planning
Learning objectives
- Explain rigging, lifting and banksman awareness: work planning, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Rigging, Lifting and Banksman Awareness: Work Planning
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Rigging, Lifting and Banksman Awareness
Teaching notes
Core explanation. Rigging, Lifting and Banksman Awareness: Work Planning describes a practical part of Rigging, Lifting and Banksman Awareness. Learners connect the principles to asset performance, people, operational risk, project value and local context.
Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for rigging, lifting and banksman awareness: work planning. Decisions require current information, role-appropriate authority, competent review and documented assumptions.
Worked example. Use an applied Namibia-relevant case in which a team plans rigging, lifting and banksman awareness: work planning while balancing safety, integrity, schedule, cost, environmental protection and local capability.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a decision brief for rigging, lifting and banksman awareness: work planning: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a decision brief for rigging, lifting and banksman awareness: work planning: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 6: Rigging, Lifting and Banksman Awareness: Data and Performance
Learning objectives
- Explain rigging, lifting and banksman awareness: data and performance, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Rigging, Lifting and Banksman Awareness: Data and Performance
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Rigging, Lifting and Banksman Awareness
Teaching notes
Core explanation. Rigging, Lifting and Banksman Awareness: Data and Performance describes a practical part of Rigging, Lifting and Banksman Awareness. Learners connect the principles to asset performance, people, operational risk, project value and local context.
Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for rigging, lifting and banksman awareness: data and performance. Decisions require current information, role-appropriate authority, competent review and documented assumptions.
Worked example. Use an applied Namibia-relevant case in which a team plans rigging, lifting and banksman awareness: data and performance while balancing safety, integrity, schedule, cost, environmental protection and local capability.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a decision brief for rigging, lifting and banksman awareness: data and performance: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a decision brief for rigging, lifting and banksman awareness: data and performance: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 7: Rigging, Lifting and Banksman Awareness: Applied Case
Learning objectives
- Explain rigging, lifting and banksman awareness: applied case, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Rigging, Lifting and Banksman Awareness: Applied Case
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Rigging, Lifting and Banksman Awareness
Teaching notes
Core explanation. Rigging, Lifting and Banksman Awareness: Applied Case describes a practical part of Rigging, Lifting and Banksman Awareness. Learners connect the principles to asset performance, people, operational risk, project value and local context.
Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for rigging, lifting and banksman awareness: applied case. Decisions require current information, role-appropriate authority, competent review and documented assumptions.
Worked example. Use an applied Namibia-relevant case in which a team plans rigging, lifting and banksman awareness: applied case while balancing safety, integrity, schedule, cost, environmental protection and local capability.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a decision brief for rigging, lifting and banksman awareness: applied case: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a decision brief for rigging, lifting and banksman awareness: applied case: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 8: Rigging, Lifting and Banksman Awareness: Communication and Escalation
Learning objectives
- Explain rigging, lifting and banksman awareness: communication and escalation, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Rigging, Lifting and Banksman Awareness: Communication and Escalation
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Rigging, Lifting and Banksman Awareness
Teaching notes
Core explanation. Rigging, Lifting and Banksman Awareness: Communication and Escalation describes a practical part of Rigging, Lifting and Banksman Awareness. Learners connect the principles to asset performance, people, operational risk, project value and local context.
Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for rigging, lifting and banksman awareness: communication and escalation. Decisions require current information, role-appropriate authority, competent review and documented assumptions.
Worked example. Use an applied Namibia-relevant case in which a team plans rigging, lifting and banksman awareness: communication and escalation while balancing safety, integrity, schedule, cost, environmental protection and local capability.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a decision brief for rigging, lifting and banksman awareness: communication and escalation: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a decision brief for rigging, lifting and banksman awareness: communication and escalation: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 9: Rigging, Lifting and Banksman Awareness: Knowledge Check
Learning objectives
- Explain rigging, lifting and banksman awareness: knowledge check, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Rigging, Lifting and Banksman Awareness: Knowledge Check
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Rigging, Lifting and Banksman Awareness
Teaching notes
Core explanation. Rigging, Lifting and Banksman Awareness: Knowledge Check describes a practical part of Rigging, Lifting and Banksman Awareness. Learners connect the principles to asset performance, people, operational risk, project value and local context.
Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for rigging, lifting and banksman awareness: knowledge check. Decisions require current information, role-appropriate authority, competent review and documented assumptions.
Worked example. Use an applied Namibia-relevant case in which a team plans rigging, lifting and banksman awareness: knowledge check while balancing safety, integrity, schedule, cost, environmental protection and local capability.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a decision brief for rigging, lifting and banksman awareness: knowledge check: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a decision brief for rigging, lifting and banksman awareness: knowledge check: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 10: Rigging, Lifting and Banksman Awareness: Competence Review
Learning objectives
- Explain rigging, lifting and banksman awareness: competence review, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Rigging, Lifting and Banksman Awareness: Competence Review
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Rigging, Lifting and Banksman Awareness
Teaching notes
Core explanation. Rigging, Lifting and Banksman Awareness: Competence Review describes a practical part of Rigging, Lifting and Banksman Awareness. Learners connect the principles to asset performance, people, operational risk, project value and local context.
Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for rigging, lifting and banksman awareness: competence review. Decisions require current information, role-appropriate authority, competent review and documented assumptions.
Worked example. Use an applied Namibia-relevant case in which a team plans rigging, lifting and banksman awareness: competence review while balancing safety, integrity, schedule, cost, environmental protection and local capability.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a decision brief for rigging, lifting and banksman awareness: competence review: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a decision brief for rigging, lifting and banksman awareness: competence review: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Draft learning content for review. This page does not represent accreditation or an external certificate. Confirm delivery, entry requirements and approval status with the Academy. Practice questions are generated drafts and require subject-matter review.