Production Optimisation and Integrated Asset Management
12-18 weeks PC programme focused on Production Optimisation and Integrated Asset Management, using energy-sector cases and applied decisions.
Download complete course manual (PDF)
YOUR AVATAR GUIDE
Learn with your course presenter
Listen to any module using the voice available on this device. Choose a module below to begin.
What you will learn
- Explain core principles and terminology for Production Optimisation and Integrated Asset Management.
- Interpret an applied case using evidence and stated assumptions.
- Identify risks, safeguards, role boundaries and escalation points.
- Prepare a clear recommendation for a multidisciplinary audience.
Module 1: Production Optimisation and Integrated Asset Management: Core Concepts
Learning objectives
- Explain production optimisation and integrated asset management: core concepts, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Production Optimisation and Integrated Asset Management: Core Concepts
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Production Optimisation and Integrated Asset Management
Teaching notes
Core explanation. Production Optimisation and Integrated Asset Management: Core Concepts describes a practical part of Production Optimisation and Integrated Asset Management. Learners connect the principles to asset performance, people, operational risk, project value and local context.
Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for production optimisation and integrated asset management: core concepts. Decisions require current information, role-appropriate authority, competent review and documented assumptions.
Worked example. Use an applied Namibia-relevant case in which a team plans production optimisation and integrated asset management: core concepts while balancing safety, integrity, schedule, cost, environmental protection and local capability.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a decision brief for production optimisation and integrated asset management: core concepts: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a decision brief for production optimisation and integrated asset management: core concepts: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 2: Production forecasting
Learning objectives
- Explain production forecasting, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Production forecasting
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Production Optimisation and Integrated Asset Management
Teaching notes
Core explanation. Forecasts combine reservoir behaviour, well availability, ramp-up, capacity constraints and downtime. Distinguish potential reservoir production from saleable output. State units, time basis and whether rates are instantaneous, daily averages or annual totals.
Decision logic. Build low, base and high cases with internally consistent constraints. Bottlenecks can shift as water production rises. Compare forecast to observed history when available and track revisions with reasons. Do not assign actual Namibian first-oil dates from classroom scenarios.
Worked example. A system with 100,000 barrels/day potential and 90% availability yields 90,000 barrels/day average before other constraints.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a one-year forecast with availability falling to 80% for three months.
Model answer guide. Calculate period-weighted output and explain facility versus reservoir constraints separately.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a one-year forecast with availability falling to 80% for three months.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 3: Production Optimisation and Integrated Asset Management: Systems and Interfaces
Learning objectives
- Explain production optimisation and integrated asset management: systems and interfaces, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Production Optimisation and Integrated Asset Management: Systems and Interfaces
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Production Optimisation and Integrated Asset Management
Teaching notes
Core explanation. Production Optimisation and Integrated Asset Management: Systems and Interfaces describes a practical part of Production Optimisation and Integrated Asset Management. Learners connect the principles to asset performance, people, operational risk, project value and local context.
Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for production optimisation and integrated asset management: systems and interfaces. Decisions require current information, role-appropriate authority, competent review and documented assumptions.
Worked example. Use an applied Namibia-relevant case in which a team plans production optimisation and integrated asset management: systems and interfaces while balancing safety, integrity, schedule, cost, environmental protection and local capability.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a decision brief for production optimisation and integrated asset management: systems and interfaces: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a decision brief for production optimisation and integrated asset management: systems and interfaces: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 4: Produced water and gas management
Learning objectives
- Explain produced water and gas management, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Produced water and gas management
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Production Optimisation and Integrated Asset Management
Teaching notes
Core explanation. Produced water and associated gas affect processing capacity, corrosion, disposal and emissions. Explain separation, treatment, reinjection, export and permitted disposal as options with different technical and environmental implications.
Decision logic. Track total fluid rather than oil alone. Gas composition can change treatment and materials requirements. Disposal choices require permits, monitoring and assurance; no universal discharge limit is provided here. Gas flaring is not an automatic default business case.
Worked example. Oil stays at 20,000 barrels/day while water cut rises from 20% to 50%; total liquid increases from 25,000 to 40,000 barrels/day.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Calculate water volumes and identify affected equipment.
Model answer guide. Water rises from 5,000 to 20,000 barrels/day; assess separation, pumping, treatment and disposal capacity.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Calculate water volumes and identify affected equipment.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 5: Flow assurance
Learning objectives
- Explain flow assurance, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Flow assurance
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Production Optimisation and Integrated Asset Management
Teaching notes
Core explanation. Flow assurance manages the ability to transport fluids through operating and transient conditions. Hydrates, wax, scale, corrosion and slugging can threaten performance. Explain the pressure-temperature-composition relationship qualitatively with a cooling pipeline sketch.
Decision logic. Assess startup, shutdown and restart as well as steady operation. Chemical treatment, insulation and operating strategies interact with facilities and environmental constraints. Classroom discussion does not prescribe inhibitor doses or live restart sequences.
Worked example. A pipeline flows normally when warm but cools during a long shutdown, changing restart risk.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Build a flow-assurance risk register for normal operation and shutdown.
Model answer guide. Include fluid data, thermal history, safeguards, monitoring and an authorised specialist review before restart.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Build a flow-assurance risk register for normal operation and shutdown.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 6: Well testing and pressure interpretation
Learning objectives
- Explain well testing and pressure interpretation, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Well testing and pressure interpretation
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Production Optimisation and Integrated Asset Management
Teaching notes
Core explanation. A well test records flow and pressure response to infer reservoir and well behaviour. Explain drawdown, buildup, skin and boundary effects conceptually. Measurement resolution, rate history and test duration constrain interpretation.
Decision logic. Different models can fit limited data. Use derivative behaviour and independent geology to test models rather than declaring a unique answer. Short tests may not observe distant boundaries. Operational testing requires an approved programme and safety controls.
Worked example. A short buildup appears stable but has not investigated the reservoir boundary; connectivity remains uncertain.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Review a fictional test summary and list claims supported and unsupported by it.
Model answer guide. Separate local mobility evidence from field-wide connectivity and long-term deliverability claims.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Review a fictional test summary and list claims supported and unsupported by it.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 7: Industrial data architecture and governance
Learning objectives
- Explain industrial data architecture and governance, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Industrial data architecture and governance
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Production Optimisation and Integrated Asset Management
Teaching notes
Core explanation. Industrial data flows from sensors through historians and integration platforms to analysis and decisions. Define asset identity, units, timestamps, quality status and ownership. A large dataset is not necessarily fit for purpose.
Decision logic. Check time synchronisation, missing values, calibration changes and access permissions before analysis. Keep provenance and revision history. Avoid transferring confidential operational data into exercises; all datasets in this package are fictional.
Worked example. A trend combines pressure in bar and kilopascals under one label, producing a false step change.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Create a data dictionary and quality checks for a fictional dataset.
Model answer guide. Define units, time basis, validity flags, owner and transformations; resolve inconsistent units before interpretation.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Create a data dictionary and quality checks for a fictional dataset.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 8: Production optimisation
Learning objectives
- Explain production optimisation, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Production optimisation
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Production Optimisation and Integrated Asset Management
Teaching notes
Core explanation. Production optimisation considers reservoir inflow, wellbore outflow, gathering network and facilities together. Nodal analysis examines pressure balance across the system. The best local setting may overload shared equipment or harm recovery.
Decision logic. Use constraints and marginal value to prioritise opportunities. Validate meter quality before changing settings. Changes require operating review and controlled implementation; the classroom does not authorise adjustments to live wells or control systems.
Worked example. Opening one fictional well increases its rate but exceeds separator capacity, reducing total stable production.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Identify the system bottleneck and compare two constrained operating cases.
Model answer guide. Optimise total safe value and honour facility limits, rather than maximising each well independently.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Identify the system bottleneck and compare two constrained operating cases.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 9: Safety and project leadership
Learning objectives
- Explain safety and project leadership, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Safety and project leadership
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Production Optimisation and Integrated Asset Management
Teaching notes
Core explanation. Leadership sets priorities through decisions, resources and response to bad news. Explain the difference between stated values and incentives that reward unsafe shortcuts. Leaders need clear delegation, listening and evidence-based challenge.
Decision logic. Use leading indicators tied to important barriers and delivery outcomes. Review overdue actions and organisational capacity, not just aggregate counts. Encourage escalation and resolve conflicting objectives openly. Authority remains accountable even when tasks are delegated.
Worked example. A manager requests schedule recovery while critical tests are incomplete. The team must resolve priorities explicitly.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Write a leadership response and a 30-day improvement plan.
Model answer guide. Require safe sequencing, resources, action owners and follow-up; do not reward concealment of incomplete work.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Write a leadership response and a 30-day improvement plan.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Module 10: Production Optimisation and Integrated Asset Management: Competence Review
Learning objectives
- Explain production optimisation and integrated asset management: competence review, interpret a case, select appropriate controls and justify a documented decision.
Lessons
- Purpose and key terms of Production Optimisation and Integrated Asset Management: Competence Review
- Systems and operating context
- Evidence, assumptions and decision gates
- Hazards, safeguards and escalation
- Applied case: Production Optimisation and Integrated Asset Management
Teaching notes
Core explanation. Production Optimisation and Integrated Asset Management: Competence Review describes a practical part of Production Optimisation and Integrated Asset Management. Learners connect the principles to asset performance, people, operational risk, project value and local context.
Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for production optimisation and integrated asset management: competence review. Decisions require current information, role-appropriate authority, competent review and documented assumptions.
Worked example. Use an applied Namibia-relevant case in which a team plans production optimisation and integrated asset management: competence review while balancing safety, integrity, schedule, cost, environmental protection and local capability.
Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.
Activity. Prepare a decision brief for production optimisation and integrated asset management: competence review: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.
Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).
Activity
Prepare a decision brief for production optimisation and integrated asset management: competence review: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.
Assessment
Formative: 10-question practice quiz with answer feedback
Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.
Resources
- Supplied GExperts/IUM reference materials; verify reuse rights and currentness.
- Current applicable Namibian legislation, standards and approved site procedures supplied by the provider.
- Case worksheet and instructor slides must be produced and reviewed before course release.
Draft learning content for review. This page does not represent accreditation or an external certificate. Confirm delivery, entry requirements and approval status with the Academy. Practice questions are generated drafts and require subject-matter review.