EX

Executive Decision-Making Under Resource Uncertainty

2-3 days · Designed for Boards, executives, public officials and senior managers

2-3 days EX programme focused on Executive Decision-Making Under Resource Uncertainty, using energy-sector cases and applied decisions.

Download complete course manual (PDF)

Illustrated course presenter

YOUR AVATAR GUIDE

Learn with your course presenter

Listen to any module using the voice available on this device. Choose a module below to begin.

What you will learn

Module 1: Executive Decision-Making Under Resource Uncertainty: Core Concepts

Learning objectives

Lessons

  1. Purpose and key terms of Executive Decision-Making Under Resource Uncertainty: Core Concepts
  2. Systems and operating context
  3. Evidence, assumptions and decision gates
  4. Hazards, safeguards and escalation
  5. Applied case: Executive Decision-Making Under Resource Uncertainty

Teaching notes

## Teaching notes

Core explanation. Executive Decision-Making Under Resource Uncertainty: Core Concepts describes a practical part of Executive Decision-Making Under Resource Uncertainty. Learners connect the principles to asset performance, people, operational risk, project value and local context.

Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for executive decision-making under resource uncertainty: core concepts. Decisions require current information, role-appropriate authority, competent review and documented assumptions.

Worked example. Use an applied Namibia-relevant case in which a team plans executive decision-making under resource uncertainty: core concepts while balancing safety, integrity, schedule, cost, environmental protection and local capability.

Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.

Activity. Prepare a decision brief for executive decision-making under resource uncertainty: core concepts: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.

Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).

Activity

Prepare a decision brief for executive decision-making under resource uncertainty: core concepts: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Assessment

Formative: 10-question practice quiz with answer feedback

Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.

Resources

Module 2: Volumetric estimation

Learning objectives

Lessons

  1. Purpose and key terms of Volumetric estimation
  2. Systems and operating context
  3. Evidence, assumptions and decision gates
  4. Hazards, safeguards and escalation
  5. Applied case: Executive Decision-Making Under Resource Uncertainty

Teaching notes

## Teaching notes

Core explanation. Oil initially in place can be estimated from bulk rock volume, net-to-gross, porosity and hydrocarbon saturation, divided by oil formation volume factor. Keep all units consistent. In-place oil is different from recoverable resources, which require recovery and development assumptions.

Decision logic. Avoid combining unrelated optimistic parameters into an unlabelled base case. Preserve dependence between area, thickness and reservoir quality. Present ranges and indicate which measurements drive uncertainty. Recovery factor is a scenario assumption until supported by reservoir evaluation.

Worked example. Using SI volumes: 1 million cubic metres bulk rock, NTG 0.5, porosity 0.2, oil saturation 0.7 and Bo 1.2 gives about 58,333 stock-tank cubic metres in place.

Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.

Activity. Recalculate after halving net-to-gross and interpret the result.

Model answer guide. The estimate halves to about 29,167 cubic metres; this remains in-place oil, not booked reserves.

Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).

Activity

Recalculate after halving net-to-gross and interpret the result.

Assessment

Formative: 10-question practice quiz with answer feedback

Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.

Resources

Module 3: Production forecasting

Learning objectives

Lessons

  1. Purpose and key terms of Production forecasting
  2. Systems and operating context
  3. Evidence, assumptions and decision gates
  4. Hazards, safeguards and escalation
  5. Applied case: Executive Decision-Making Under Resource Uncertainty

Teaching notes

## Teaching notes

Core explanation. Forecasts combine reservoir behaviour, well availability, ramp-up, capacity constraints and downtime. Distinguish potential reservoir production from saleable output. State units, time basis and whether rates are instantaneous, daily averages or annual totals.

Decision logic. Build low, base and high cases with internally consistent constraints. Bottlenecks can shift as water production rises. Compare forecast to observed history when available and track revisions with reasons. Do not assign actual Namibian first-oil dates from classroom scenarios.

Worked example. A system with 100,000 barrels/day potential and 90% availability yields 90,000 barrels/day average before other constraints.

Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.

Activity. Prepare a one-year forecast with availability falling to 80% for three months.

Model answer guide. Calculate period-weighted output and explain facility versus reservoir constraints separately.

Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).

Activity

Prepare a one-year forecast with availability falling to 80% for three months.

Assessment

Formative: 10-question practice quiz with answer feedback

Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.

Resources

Module 4: Sensitivity and scenario analysis

Learning objectives

Lessons

  1. Purpose and key terms of Sensitivity and scenario analysis
  2. Systems and operating context
  3. Evidence, assumptions and decision gates
  4. Hazards, safeguards and escalation
  5. Applied case: Executive Decision-Making Under Resource Uncertainty

Teaching notes

## Teaching notes

Core explanation. Sensitivity changes one input to understand model response; scenarios change coherent sets of assumptions. A tornado chart ranks tested effects, not the probability of events. Distinguish uncertainty ranges from forecasts and assigned probabilities.

Decision logic. Check dependencies: schedule delay may increase cost and defer revenue together. A correlated downside should not be represented as independent optimistic inputs. Identify decision-changing variables and the evidence that could narrow them.

Worked example. Price down 20% and CAPEX up 20% are separate sensitivities; combined delay, inflation and low price is a downside scenario.

Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.

Activity. Prepare a sensitivity table and one coherent downside scenario.

Model answer guide. Preserve the base case, document changed inputs, and explain causal links in the combined case.

Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).

Activity

Prepare a sensitivity table and one coherent downside scenario.

Assessment

Formative: 10-question practice quiz with answer feedback

Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.

Resources

Module 5: Executive Decision-Making Under Resource Uncertainty: Work Planning

Learning objectives

Lessons

  1. Purpose and key terms of Executive Decision-Making Under Resource Uncertainty: Work Planning
  2. Systems and operating context
  3. Evidence, assumptions and decision gates
  4. Hazards, safeguards and escalation
  5. Applied case: Executive Decision-Making Under Resource Uncertainty

Teaching notes

## Teaching notes

Core explanation. Executive Decision-Making Under Resource Uncertainty: Work Planning describes a practical part of Executive Decision-Making Under Resource Uncertainty. Learners connect the principles to asset performance, people, operational risk, project value and local context.

Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for executive decision-making under resource uncertainty: work planning. Decisions require current information, role-appropriate authority, competent review and documented assumptions.

Worked example. Use an applied Namibia-relevant case in which a team plans executive decision-making under resource uncertainty: work planning while balancing safety, integrity, schedule, cost, environmental protection and local capability.

Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.

Activity. Prepare a decision brief for executive decision-making under resource uncertainty: work planning: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.

Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).

Activity

Prepare a decision brief for executive decision-making under resource uncertainty: work planning: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Assessment

Formative: 10-question practice quiz with answer feedback

Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.

Resources

Module 6: Executive Decision-Making Under Resource Uncertainty: Data and Performance

Learning objectives

Lessons

  1. Purpose and key terms of Executive Decision-Making Under Resource Uncertainty: Data and Performance
  2. Systems and operating context
  3. Evidence, assumptions and decision gates
  4. Hazards, safeguards and escalation
  5. Applied case: Executive Decision-Making Under Resource Uncertainty

Teaching notes

## Teaching notes

Core explanation. Executive Decision-Making Under Resource Uncertainty: Data and Performance describes a practical part of Executive Decision-Making Under Resource Uncertainty. Learners connect the principles to asset performance, people, operational risk, project value and local context.

Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for executive decision-making under resource uncertainty: data and performance. Decisions require current information, role-appropriate authority, competent review and documented assumptions.

Worked example. Use an applied Namibia-relevant case in which a team plans executive decision-making under resource uncertainty: data and performance while balancing safety, integrity, schedule, cost, environmental protection and local capability.

Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.

Activity. Prepare a decision brief for executive decision-making under resource uncertainty: data and performance: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.

Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).

Activity

Prepare a decision brief for executive decision-making under resource uncertainty: data and performance: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Assessment

Formative: 10-question practice quiz with answer feedback

Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.

Resources

Module 7: Executive Decision-Making Under Resource Uncertainty: Applied Case

Learning objectives

Lessons

  1. Purpose and key terms of Executive Decision-Making Under Resource Uncertainty: Applied Case
  2. Systems and operating context
  3. Evidence, assumptions and decision gates
  4. Hazards, safeguards and escalation
  5. Applied case: Executive Decision-Making Under Resource Uncertainty

Teaching notes

## Teaching notes

Core explanation. Executive Decision-Making Under Resource Uncertainty: Applied Case describes a practical part of Executive Decision-Making Under Resource Uncertainty. Learners connect the principles to asset performance, people, operational risk, project value and local context.

Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for executive decision-making under resource uncertainty: applied case. Decisions require current information, role-appropriate authority, competent review and documented assumptions.

Worked example. Use an applied Namibia-relevant case in which a team plans executive decision-making under resource uncertainty: applied case while balancing safety, integrity, schedule, cost, environmental protection and local capability.

Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.

Activity. Prepare a decision brief for executive decision-making under resource uncertainty: applied case: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.

Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).

Activity

Prepare a decision brief for executive decision-making under resource uncertainty: applied case: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Assessment

Formative: 10-question practice quiz with answer feedback

Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.

Resources

Module 8: Executive Decision-Making Under Resource Uncertainty: Communication and Escalation

Learning objectives

Lessons

  1. Purpose and key terms of Executive Decision-Making Under Resource Uncertainty: Communication and Escalation
  2. Systems and operating context
  3. Evidence, assumptions and decision gates
  4. Hazards, safeguards and escalation
  5. Applied case: Executive Decision-Making Under Resource Uncertainty

Teaching notes

## Teaching notes

Core explanation. Executive Decision-Making Under Resource Uncertainty: Communication and Escalation describes a practical part of Executive Decision-Making Under Resource Uncertainty. Learners connect the principles to asset performance, people, operational risk, project value and local context.

Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for executive decision-making under resource uncertainty: communication and escalation. Decisions require current information, role-appropriate authority, competent review and documented assumptions.

Worked example. Use an applied Namibia-relevant case in which a team plans executive decision-making under resource uncertainty: communication and escalation while balancing safety, integrity, schedule, cost, environmental protection and local capability.

Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.

Activity. Prepare a decision brief for executive decision-making under resource uncertainty: communication and escalation: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.

Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).

Activity

Prepare a decision brief for executive decision-making under resource uncertainty: communication and escalation: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Assessment

Formative: 10-question practice quiz with answer feedback

Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.

Resources

Module 9: Executive Decision-Making Under Resource Uncertainty: Knowledge Check

Learning objectives

Lessons

  1. Purpose and key terms of Executive Decision-Making Under Resource Uncertainty: Knowledge Check
  2. Systems and operating context
  3. Evidence, assumptions and decision gates
  4. Hazards, safeguards and escalation
  5. Applied case: Executive Decision-Making Under Resource Uncertainty

Teaching notes

## Teaching notes

Core explanation. Executive Decision-Making Under Resource Uncertainty: Knowledge Check describes a practical part of Executive Decision-Making Under Resource Uncertainty. Learners connect the principles to asset performance, people, operational risk, project value and local context.

Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for executive decision-making under resource uncertainty: knowledge check. Decisions require current information, role-appropriate authority, competent review and documented assumptions.

Worked example. Use an applied Namibia-relevant case in which a team plans executive decision-making under resource uncertainty: knowledge check while balancing safety, integrity, schedule, cost, environmental protection and local capability.

Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.

Activity. Prepare a decision brief for executive decision-making under resource uncertainty: knowledge check: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.

Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).

Activity

Prepare a decision brief for executive decision-making under resource uncertainty: knowledge check: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Assessment

Formative: 10-question practice quiz with answer feedback

Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.

Resources

Module 10: Executive Decision-Making Under Resource Uncertainty: Competence Review

Learning objectives

Lessons

  1. Purpose and key terms of Executive Decision-Making Under Resource Uncertainty: Competence Review
  2. Systems and operating context
  3. Evidence, assumptions and decision gates
  4. Hazards, safeguards and escalation
  5. Applied case: Executive Decision-Making Under Resource Uncertainty

Teaching notes

## Teaching notes

Core explanation. Executive Decision-Making Under Resource Uncertainty: Competence Review describes a practical part of Executive Decision-Making Under Resource Uncertainty. Learners connect the principles to asset performance, people, operational risk, project value and local context.

Decision logic. Review the objective, evidence, limits, interfaces and applicable controls for executive decision-making under resource uncertainty: competence review. Decisions require current information, role-appropriate authority, competent review and documented assumptions.

Worked example. Use an applied Namibia-relevant case in which a team plans executive decision-making under resource uncertainty: competence review while balancing safety, integrity, schedule, cost, environmental protection and local capability.

Facilitator prompts. Ask learners to distinguish verified facts from assumptions, identify who has decision authority, name stop-work triggers and state what evidence could change their recommendation. Compare technical, HSE, commercial and community perspectives.

Activity. Prepare a decision brief for executive decision-making under resource uncertainty: competence review: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Model answer guide. A sound response defines scope; uses current, traceable evidence; applies approved requirements and controls; records assumptions; assigns competent owners; checks interfaces; and communicates a measurable decision with an escalation path.

Assessment evidence. Score accuracy (30%), use of evidence (20%), safeguards (20%), analysis (20%) and communication (10%).

Activity

Prepare a decision brief for executive decision-making under resource uncertainty: competence review: scope, evidence, assumptions, hazards, safeguards, owner, decision gate and escalation trigger.

Assessment

Formative: 10-question practice quiz with answer feedback

Summative: Applied decision brief or practical case assessed against the rubric; proposed pass mark 70%, subject to academic approval.

Resources

Draft learning content for review. This page does not represent accreditation or an external certificate. Confirm delivery, entry requirements and approval status with the Academy. Practice questions are generated drafts and require subject-matter review.

Enquire about this course